(1) Project Overview
Project Name: Shaoguan Qujiang Xiaokeng Reservoir Road Ya Fishing Floating Pier
Project Year: June 2015
Project location: Shaoguan
Design Unit: Guangzhou Blue Water Architectural Design Co., Ltd
Construction unit: Guangzhou Deli Yacht Terminal Engineering Co., Ltd
(2) Project Overview
The Luya Fishing Floating Pier is located in Shaoguan City, Guangdong Province. The Luya Fishing Floating Pier project in Xiaokeng Reservoir, Qujiang, Shaoguan is developed, designed, and constructed by Guangzhou Deli Yacht Terminal Engineering Co., Ltd. The initial floating dock area of the project is 690 square meters. Considering factors such as the turning water area, dock occupation of water area, and construction scale, we have arranged 37 berths, including 30 fishing boat berths, 4 motorboat berths, and 3 small yacht berths. Different from traditional floating docks, this project's floating dock adopts more advanced lightweight materials and winch anchoring positioning method. The dock has relatively low freeboard, better hydrophilicity, and lower cost, making it a new type of floating dock that can better adapt to high water level drops.
The successful operation of the Xiakeng Reservoir Luya Fishing Floating Terminal project in Shaoguan Qujiang demonstrates the superiority of a new service-oriented architecture. Through the development and use of advanced technology in the floating terminal field, the project's operation, deployment, and integration costs have been reduced; By using, the scalability and compatibility of the floating dock have been improved, the adaptability of the floating dock system has been enhanced, and the overall safety level and service quality of the floating dock system have been improved, making greater contributions to the development of the yacht industry.