(1) Project Overview
Project Name: Hainan Haikou Mangrove Cruise Terminal
Project Year: June 2014
Project location: Haikou, Hainan
Construction scale: 690 square meters, 36 berths
Project Status: Completed
Design Unit: Guangzhou Blue Water Architectural Design Co., Ltd
Construction unit: Guangzhou Deli Yacht Terminal Engineering Co., Ltd
(2) Project Overview
Arriving at the Dongzhai Port Mangrove Tourism Scenic Area, a quaint and elegant reception center, a newly renovated dock, a crowded boardwalk for visitors, and white egrets soaring above the mangrove forest, a beautiful painting comes into view. The biggest change is the dock, which used to be dirty, messy, and poor. There were several restaurants operating here, and there was a lot of household waste, which affected the environment. Previously, fishing boats docked at the dock were also used as sightseeing boats. Fishing boats with oil pump power devices have loud noise, and if oil spills, they can also pollute seawater. Now, the newly built dock has introduced electric sightseeing boats, which are energy-saving, emission reducing, and environmentally friendly. Sitting on the boat is very stable and comfortable.



