(1) Project Overview
Project Name: Dongguan Songshan Lake Vanke Light Rowing Floating Pier
Project Year: January 2015
Project location: Dongguan
Design Unit: Guangzhou Blue Water Architectural Design Co., Ltd
Construction unit: Guangzhou Deli Yacht Terminal Engineering Co., Ltd
(2) Project Overview
The newly developed lightweight rowing floating dock by Deli has a novel appearance, diverse functions, easy assembly, good durability, easy maintenance, low freeboard, high quality and low price, effectively adapting to the mooring characteristics of small boats. While ensuring the safety of the dock and boats, the cost is controlled to the lowest possible level.



