The project is located on the coastline of Kenya, so the changes in tides and sea areas are an important and challenging factor for planning, design, and construction
Construction scale: The floating bridge has a total length of 100m and a width of 2.5m, with an approach bridge. The positioning method uses concrete piles and anchor rods